
The Library
Can target costing and whole life costing be applied in the construction industry ?: Evidence from two case studies
Tools
UNSPECIFIED (2000) Can target costing and whole life costing be applied in the construction industry ?: Evidence from two case studies. BRITISH JOURNAL OF MANAGEMENT, 11 (4). pp. 303-324. ISSN 1045-3172.
Research output not available from this repository.
Request-a-Copy directly from author or use local Library Get it For Me service.
Abstract
Building on the results: of a far-reaching action research project we discuss an attempt to introduce target resting in the UK construction industry, After examining some of the issues facing the UK construction industry we examine the case for using target costing as a way of supporting supply-chain integration in view of an improvement of the level of profitability and quality of the industry, After presenting evidence from two pilot projects we propose some considerations on target costing and its applicability to the UK construction sector and derive directions for future research.
Item Type: | Journal Article | ||||
---|---|---|---|---|---|
Subjects: | H Social Sciences > HF Commerce H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
||||
Journal or Publication Title: | BRITISH JOURNAL OF MANAGEMENT | ||||
Publisher: | BLACKWELL PUBL LTD | ||||
ISSN: | 1045-3172 | ||||
Official Date: | December 2000 | ||||
Dates: |
|
||||
Volume: | 11 | ||||
Number: | 4 | ||||
Number of Pages: | 22 | ||||
Page Range: | pp. 303-324 | ||||
Publication Status: | Published |
Data sourced from Thomson Reuters' Web of Knowledge
Request changes or add full text files to a record
Repository staff actions (login required)
![]() |
View Item |