The Library
Design and Construction of a novel lining system for a large water retaining shaft on the Lee Tunnel Project
Tools
Eddie, C. M. and Allen, C. (2012) Design and Construction of a novel lining system for a large water retaining shaft on the Lee Tunnel Project. In: 3rd International Conference on Shaft Design and Construction (IOM3), London, 04 Apr 2012
Research output not available from this repository.
Request-a-Copy directly from author or use local Library Get it For Me service.
Item Type: | Conference Item (Paper) | ||||||
---|---|---|---|---|---|---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | Faculty of Science, Engineering and Medicine > Engineering > Engineering | ||||||
Official Date: | April 2012 | ||||||
Dates: |
|
||||||
Status: | Not Peer Reviewed | ||||||
Publication Status: | Published | ||||||
Access rights to Published version: | Restricted or Subscription Access | ||||||
Conference Paper Type: | Paper | ||||||
Title of Event: | 3rd International Conference on Shaft Design and Construction (IOM3) | ||||||
Type of Event: | Conference | ||||||
Location of Event: | London | ||||||
Date(s) of Event: | 04 Apr 2012 | ||||||
Related URLs: |
Request changes or add full text files to a record
Repository staff actions (login required)
View Item |