Skip to content Skip to navigation
University of Warwick
  • Study
  • |
  • Research
  • |
  • Business
  • |
  • Alumni
  • |
  • News
  • |
  • About

University of Warwick
Publications service & WRAP

Highlight your research

  • WRAP
    • Home
    • Search WRAP
    • Browse by Warwick Author
    • Browse WRAP by Year
    • Browse WRAP by Subject
    • Browse WRAP by Department
    • Browse WRAP by Funder
    • Browse Theses by Department
  • Publications Service
    • Home
    • Search Publications Service
    • Browse by Warwick Author
    • Browse Publications service by Year
    • Browse Publications service by Subject
    • Browse Publications service by Department
    • Browse Publications service by Funder
  • Statistics
  • Help & Advice
University of Warwick

The Library

  • Login

A review of transparent insulation systems and the evaluation of payback period for building applications

Tools
- Tools
+ Tools

Wong, I. L., Eames, P. C. and Perera, R. S. (2007) A review of transparent insulation systems and the evaluation of payback period for building applications. In: CISBAT International Conference on Solar Energy Applications to Buildings, Swiss Fed Inst Technol, Lausanne, SWITZERLAND, 2005. Published in: SOLAR ENERGY, 81 (9 Sp. Iss. SI). pp. 1058-1071.

Full text not available from this repository.
Official URL: http://dx.doi.org/10.1016/j.solener.2007.04.004

Abstract

Research and development of transparent insulation systems (TI-systems) has been ongoing for 20 years with transparent insulation materials (TIMs) used to replace standard opaque insulation materials. TIM not only performs similar functions to opaque insulation, reducing heat losses and controlling indoor temperatures, but allows solar transmittance of more than 50%. With a thickness of less than 20 cm, it can provide a financial return to building occupants when applied to building facades, maximising occupiable and sellable spaces in urban areas, without compromising thermal comfort within buildings. In this review of TI-systems for building applications, drawbacks to previous applications, cost trends, and analysis of the limitation in information from previous studies are discussed. A major drawback in the development of TI-systems identified is the lack of cost information; the payback periods for TI-systems used in previous renovation projects are virtually unknown. Simple payback period calculations were undertaken based on information available from a demonstration project documented by the Solar Heating and Cooling (SHC) Programme of the International Energy Agency (IEA) Task 20 "Solar Energy in Building Renovation". The calculations indicated an encouraging 5-8-year payback period for this particular case study. It was concluded that the simple payback period calculation may be used for feasibility studies to indicate the time required to recoup investment when installing TI-systems and to provide initial guidance for building designers when evaluating the potential application of TI-systents in their buildings. (c) 2007 Elsevier Ltd. All rights reserved.

Item Type: Conference Item (UNSPECIFIED)
Subjects: T Technology > TJ Mechanical engineering and machinery
Journal or Publication Title: SOLAR ENERGY
Publisher: PERGAMON-ELSEVIER SCIENCE LTD
ISSN: 0038-092X
Date: 2007
Volume: 81
Number: 9 Sp. Iss. SI
Number of Pages: 14
Page Range: pp. 1058-1071
Identification Number: 10.1016/j.solener.2007.04.004
Publication Status: Published
Title of Event: CISBAT International Conference on Solar Energy Applications to Buildings
Location of Event: Swiss Fed Inst Technol, Lausanne, SWITZERLAND
Date(s) of Event: 2005
URI: http://wrap.warwick.ac.uk/id/eprint/31298

Data sourced from Thomson Reuters' Web of Knowledge

Request changes to a record

Actions (login required)

View Item View Item
twitter

Email us: publications@warwick.ac.uk
Contact Details
About Us