Skip to content Skip to navigation
University of Warwick
  • Study
  • |
  • Research
  • |
  • Business
  • |
  • Alumni
  • |
  • News
  • |
  • About

University of Warwick
Publications service & WRAP

Highlight your research

  • WRAP
    • Home
    • Search WRAP
    • Browse by Warwick Author
    • Browse WRAP by Year
    • Browse WRAP by Subject
    • Browse WRAP by Department
    • Browse WRAP by Funder
    • Browse Theses by Department
  • Publications Service
    • Home
    • Search Publications Service
    • Browse by Warwick Author
    • Browse Publications service by Year
    • Browse Publications service by Subject
    • Browse Publications service by Department
    • Browse Publications service by Funder
  • Statistics
  • Help & Advice
University of Warwick

The Library

  • Login

Browse by Warwick Author

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Number of items: 67.

Prakash, P., Ceglarek, Dariusz and Tiwari, M. K.. (2012) Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem. International Journal of Advanced Manufacturing Technology, Vol.60 (No.9-12). pp. 1125-1137. ISSN 0268-3768

Ceglarek, Dariusz and Prakash, P.. (2012) Enhanced piecewise least squares approach for diagnosis of ill-conditioned multistation assembly with compliant parts. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, Vol.226 (No.3). pp. 485-502. ISSN 0954-4054

Wang, Haixia and Ceglarek, Dariusz. (2012) Representation, generation, and analysis of mechanical assembly sequences with k-ary operations. Journal of Computing and Information Science in Engineering, Vol.12 (No.1). 011001. ISSN 1530-9827

Shukla, Nagesh, Tiwari, M. K. and Ceglarek, Darek. (2012) Genetic-algorithms-based algorithm portfolio for inventory routing problem with stochastic demand. International Journal of Production Research . pp. 1-20. ISSN 0020-7543 (In Press)

Maropoulos, P. G. and Ceglarek, Dariusz (2010) Design verification and validation in product lifecycle. In: 60th General Assembly of CIRP, Pisa, Italy, 22-28 Aug 2010. Published in: CIRP Annals - Manufacturing Technology, Vol.59 (No.2). pp. 740-759.

Mannar, Kamal and Ceglarek, Dariusz. (2010) Functional capability space and optimum process adjustments for manufacturing processes with in-specs failure. IIE Transactions, Vol.42 (No.2). pp. 95-106. ISSN 0740-817X

Loose, Jean-Philippe, Zhou, Qiang, Zhou, Shiyu and Ceglarek, Dariusz. (2010) Integrating GD&T into dimensional variation models for multistage machining processes. International Journal of Production Research , Vol.48 (No.11). pp. 3129-3149. ISSN 0020-7543

Tolio, T., Ceglarek, D., ElMaraghy, H. A., Fischer, A., Hu, S. J., Laperriere, L., Newman, S. T. and Vancza, J.. (2010) SPECIES-Co-evolution of products, processes and production systems. CIRP Annals - Manufacturing Technology, Vol.59 (No.2). pp. 672-693. ISSN 0007-8506

Prakash, , Ceglarek, Dariusz and Tiwari, M. K. (2009) Constraint based fast simulated annealing (CBFSA) approach to solve the disassembly scheduling problem. In: 7th International Conference on Manufacturing Research (ICMR' 09), University of Warwick, UK, 8-10 Sep 2009

Shukla, N., Ceglarek, Dariusz and Tiwari, M. K. (2009) Feature-based optimal sensor distribution for six-sigma variation diagnosis in multi-station assembly processes. In: 7th International Conference on Manufacturing Research (ICMR' 09), University of Warwick, UK, 8-10 Sep 2009

Prakash, , Izquierdo, L. E. and Ceglarek, Darek. (2009) Functional process adjustments to reduce No-Fault-Found product failures in service caused by in-tolerance faults. CIRP Annals - Manufacturing Technology, Vol.58 (No.1). pp. 37-40. ISSN 0007-8506

Prakash, and Ceglarek, Dariusz (2009) Process adjustment to eliminate fixture failure root causes in multi-station assembly system for multiple products. In: 7th International Conference on Manufacturing Research (ICMR' 09), University of Warwick, UK, 8-10 Sep 2009

Huang, Wenzhen, Phoomboplab, Tirawat and Ceglarek, Dariusz. (2009) Process capability surrogate model-based tolerance synthesis for multi-station manufacturing systems. IIE Transactions, Vol.41 (No.4). pp. 309-322. ISSN 0740-817X

Shukla, Nagesh, Keast, John, Ceglarek, Sudi L. and Ceglarek, Dariusz (2009) Role activity diagram-based workflow modelling of imaging service delivery process in radiology. In: The 7th International Conference on Manufacturing Research (ICMR' 09), University of Warwick, Coventry, U.K., Sep 8-10, 2009. Published in: Proceedings of the 7th International Conference on Manufacturing Research (ICMR' 09) pp. 283-291.

Shukla, N., Keast, John E., Ceglarek, Sudi L. and Ceglarek, Dariusz (2009) Role activity diagram-based workflow modelling of imaging service delivery process in radiology. In: 7th International Conference on Manufacturing Research (ICMR' 09), University of Warwick, UK, 8-10 Sep 2009

Ceglarek, Dariusz, Prakash, , Phoomboplab, T. and Izquierdo, L. E. (2009) Self-resilient production systems : going beyond design robustness. In: 2009 CIRP International Computer-Aided Tolerance Conference, Annecy, France, 26-27 Mar 2009

Wang, Haixia and Ceglarek, Dariusz. (2009) Variation propagation modeling and analysis at preliminary design phase of multi-station assembly systems. Assembly Automation, Vol.29 (No.2). pp. 154-166. ISSN 0144-5154

Wang, H., Yang, J. and Ceglarek, Dariusz. (2009) A graph-based data structure for assembly dimensional variation control at a preliminary phase of product design. International Journal of Computer Integrated Manufacturing , Vol.22 (No.10). pp. 948-961. ISSN 0951-192X

Phoomboplab, T. and Ceglarek, Darek. (2008) Process yield improvement through optimum design of fixture layouts in 3D multistation assembly systems. Journal of Manufacturing Science and Engineering, Vol.130 (No.6). ISSN 1087-1357

Loose, Jean-Philippe, Zhou, Shiyu and Ceglarek, Darek. (2008) Variation source identification in manufacturing processes based on relational measurements of key product characteristics. Journal of Manufacturing Science and Engineering, Vol.130 (No.3). ISSN 1087-1357

Kong, Zhenyu, Ceglarek, Darek and Huang, Wenzhen. (2008) Multiple fault diagnosis method in multistation assembly processes using orthogonal diagonalization analysis. Journal of Manufacturing Science and Engineering, Vol.130 (No.1). ISSN 1087-1357

Huang, Wenzhen, Lin, Jijun, Kong, Zhenyu and Ceglarek, Dariusz. (2007) Stream-of-variation (SOVA) modeling—part II : a generic 3D variation model for rigid body assembly in multistation assembly processes. Journal of Manufacturing Science and Engineering, Vol.129 (No.4). pp. 832-842. ISSN 1087-1357

Huang, Wenzhen, Lin, Jijun, Bezdecny, Michelle, Kong, Zhenyu and Ceglarek, Dariusz. (2007) Stream-of-variation modeling—part I : a generic three-dimensional variation model for rigid-body assembly in single station assembly processes. Journal of Manufacturing Science and Engineering, Vol.129 (No.4). pp. 821-831. ISSN 1087-1357

Loose, Jean-Philippe, Zhou, Shiyu and Ceglarek, Dariusz. (2007) Kinematic analysis of dimensional variation propagation for multistage machining processes with general fixture layouts. IEEE Transactions on Automation Science and Engineering, Vol.4 (No.2). pp. 141-152. ISSN 1545-5955

Warwick Mfg Grp (Including: Phoomboplab, T. and Ceglarek, D.). (2007) Design synthesis framework for dimensional management in multistage assembly system. CIRP Annals - Manufacturing Technology, Vol.56 (No.1). pp. 153-158. ISSN 0007-8506

Lee, Neville K. S., Yu, Grace, Joneja, Ajay and Ceglarek, Dariusz. (2006) The modeling and analysis of a butting assembly in the presence of workpiece surface roughness and part dimensional error. International Journal of Advanced Manufacturing Technology, Vol.31 (No.5-6). pp. 528-538. ISSN 0268-3768

Mannar, K., Ceglarek, D., Niu, F. and Abifaraj, B.. (2006) Fault region localization : product and process improvement based on field performance and manufacturing measurements. IEEE Transactions on Automation Science and Engineering, Vol.3 (No.4). pp. 423-439. ISSN 1545-5955

Chen, Y., Ding, Y., Jin, J. and Ceglarek, D.. (2006) Integration of process-oriented tolerancing and maintenance planning in design of multistation manufacturing processes. IEEE Transactions on Automation Science and Engineering, Vol.3 (No.4). pp. 440-453. ISSN 1545-5955

Kawalec, Andrzej, Wiktor, Jerzy and Ceglarek, Dariusz. (2006) Comparative analysis of tooth-root strength using ISO and AGMA standards in spur and helical gears with FEM-based verification. Journal of Mechanical Design, Vol.128 (No.5). p. 1141. ISSN 1050-0472

Prakash, , Ceglarek, Dariusz and Tiwari, M. K. (2006) Fault failure diagnosis for compliant assembly structures using statistical modal analysis. In: ASME 2006 International Manufacturing Science and Engineering Conference (MSEC2006) , Ypsilanti, Michigan, USA, 8–11 Oct 2006. Published in: Manufacturing Science and Engineering, Parts A and B, 2006 pp. 731-742.

Kong, Zhenyu and Ceglarek, Dariusz. (2006) Fixture workspace synthesis for reconfigurable assembly using procrustes-based pairwise configuration optimization. Journal of Manufacturing Systems, Vol.25 (No.1). pp. 25-38. ISSN 0278-6125

Kong, Z., Kumar, R., Gogineni, S., Zhou, Y. and Ceglarek, Dariusz (2006) Stream of variation analysis for multiple station assembly process with consideration of various tolerance modes. In: 34th North American Manufacturing Research Conference (NAMRC), Marquette University, Milwaukee, Wisconsin, USA., May 2006. Published in: Transactions of the North American Manufacturing Research Conference, Vol.34 pp. 469-476.

Kong, Zhenyu, Huang, Wenzhen and Ceglarek, Dariusz. (2005) Visibility analysis for assembly fixture calibration using screen space transformation. Journal of Manufacturing Science and Engineering, Vol.127 (No.3). pp. 622-634. ISSN 1087-1357

Ding, Yu, Jin, J., Ceglarek, Dariusz and Shi, Jianjun. (2005) Process-oriented tolerancing for multi-station assembly systems. IIE Transactions, Vol.37 (No.6). pp. 493-508. ISSN 0740-817X

Wang, H. and Ceglarek, D.. (2005) Quality-driven sequence planning and line configuration selection for compliant structure assemblies. CIRP Annals - Manufacturing Technology, Vol.54 (No.1). pp. 31-35. ISSN 0007-8506

Ceglarek, Dariusz and Jin, Judy. (2004) Introduction : modeling and analysis for complex production systems. Position statement. International Journal of Flexible Manufacturing Systems, Vol.16 (No.1). pp. 5-9. ISSN 0920-6299

Ceglarek, D., Huang, W., Zhou, S., Ding, Y., Kumar, R. and Zhou, Y.. (2004) Time-based competition in multistage manufacturing : stream-of-variation analysis (SOVA) methodology—review. International Journal of Flexible Manufacturing Systems, Vol.16 (No.1). pp. 11-44. ISSN 0920-6299

Huang, Wenzhen, Ceglarek, Dariusz and Zhou, Zhige. (2004) Tolerance analysis for design of multistage manufacturing processes using number-theoretical net method (NT-net). International Journal of Flexible Manufacturing Systems, Vol.16 (No.1). pp. 65-90. ISSN 0920-6299

Mannar, K. and Ceglarek, D.. (2004) Continuous failure diagnosis for assembly systems using rough set approach. CIRP Annals - Manufacturing Technology, Vol.53 (No.1). pp. 39-42. ISSN 0007-8506

Camelio, Jaime A., Hu, S. Jack and Ceglarek, Dariusz. (2004) Impact of fixture design on sheet metal assembly variation. Journal of Manufacturing Systems, Vol.23 (No.3). pp. 182-193. ISSN 0278-6125

Takata, S., Kirnura, F., van Houten, F.J.A.M., Westkamper, E., Shpitalni, M., Ceglarek, D. and Lee, J.. (2004) Maintenance : changing role in life cycle management. CIRP Annals - Manufacturing Technology, Vol.53 (No.2). pp. 643-655. ISSN 0007-8506

Huang, Wenzhen, Kong, Zhenyu, Ceglarek, Dariusz and Brahmst, Emilio. (2004) The analysis of feature-based measurement error in coordinate metrology. IIE Transactions, Vol.36 (No.3). pp. 237-251. ISSN 0740-817X

Camelio, Jaime, Hu, S. Jack and Ceglarek, Dariusz. (2003) Modeling variation propagation of multi-station assembly systems with compliant parts. Journal of Mechanical Design, Vol.125 (No.4). pp. 673-681. ISSN 1050-0472

Yu Ding, , Pansoo Kim, , Ceglarek, D. and Jionghua Jin, . (2003) Optimal sensor distribution for variation diagnosis in multistation assembly processes. IEEE Transactions on Robotics and Automation, Vol.19 (No.4). pp. 543-556. ISSN 1042-296X

Kong, Z. and Ceglarek, Dariusz (2003) Fixture configuration synthesis for reconfigurable assembly using procrustes-based pairwise optimization. In: 31st North American Manufacturing Research Conference (NAMRC), McMaster University, Hamilton, Ontario, Canada, May 2003. Published in: Transactions of the North American Manufacturing Research Conference, Vol.31 pp. 403-410.

Kong, Zhenyu and Ceglarek, Dariusz. (2003) Rapid deployment of reconfigurable assembly fixtures using workspace synthesis and visibility analysis. CIRP Annals - Manufacturing Technology, Vol.52 (No.1). pp. 13-16. ISSN 0007-8506

Shiu, B.W., Apley, D.W, Ceglarek, Dariusz and Shi, J.. (2003) Tolerance allocation for compliant beam structure assemblies. IIE Transactions, Vol.35 (No.4). pp. 329-342. ISSN 0740-817X

Ding, Yu, Ceglarek, Dariusz and Shi, Jianjun. (2002) Design evaluation of multi-station assembly processes by using state space approach. Journal of Mechanical Design, Vol.124 (No.3). pp. 408-418. ISSN 1050-0472

Ding, Yu, Shi, Jianjun and Ceglarek, Dariusz. (2002) Diagnosability analysis of multi-station manufacturing processes. Journal of Dynamic Systems, Measurement, and Control, Vol.124 (No.1). pp. 1-13. ISSN 0022-0434

Li, Huifang and Ceglarek, Dariusz. (2002) Optimal trajectory planning for material handling of compliant sheet metal parts. Journal of Mechanical Design, Vol.124 (No.2). pp. 213-222. ISSN 1050-0472

Ding, Yu, Ceglarek, Dariusz and Shi, Jianjun. (2002) Fault diagnosis of multistage manufacturing processes by using state space approach. Journal of Manufacturing Science and Engineering, Vol.124 (No.2). pp. 313-322. ISSN 1087-1357

Huang, Wenzhen and Ceglarek, Dariusz. (2002) Mode-based decomposition of part form error by discrete-cosine-transform with implementation to assembly and stamping system with compliant parts. CIRP Annals - Manufacturing Technology, Vol.51 (No.1). pp. 21-26. ISSN 0007-8506

Li, H. F., Ceglarek, D. and Shi, Jianjun. (2002) A dexterous part-holding model for handling compliant sheet metal parts. Journal of Manufacturing Science and Engineering, Vol.124 (No.1). p. 109. ISSN 1087-1357

Rong, Q., Shi, J. and Ceglarek, D.. (2001) Adjusted least squares approach for diagnosis of ill-conditioned compliant assemblies. Journal of Manufacturing Science and Engineering, Vol.123 (No.3). pp. 453-461. ISSN 1087-1357

Ceglarek, D., Li, H. F. and Tang, Y.. (2001) Modeling and optimization of end effector layout for handling compliant sheet metal parts. Journal of Manufacturing Science and Engineering, Vol.123 (No.3). pp. 473-480. ISSN 1087-1357

Rong, Q., Ceglarek, D. and Shi, J.. (2000) Dimensional fault diagnosis for compliant beam structure assemblies. Journal of Manufacturing Science and Engineering, Vol.122 (No.4). pp. 773-780. ISSN 1087-1357

Khan, A. and Ceglarek, D.. (2000) Sensor optimization for fault diagnosis in multi-fixture assembly systems with distributed sensing. Journal of Manufacturing Science and Engineering, Vol.122 (No.1). pp. 215-226. ISSN 1087-1357

Ceglarek, D. and Shi, J.. (1999) Fixture failure diagnosis for sheet metal assembly with consideration of measurement noise. Journal of Manufacturing Science and Engineering, Vol.121 (No.4). pp. 771-777. ISSN 1087-1357

Khan, A., Ceglarek, D., Shi, J., Ni, J. and Woo, T. C.. (1999) Sensor optimization for fault diagnosis in single fixture systems : a methodology. Journal of Manufacturing Science and Engineering, Vol.121 (No.1). pp. 109-117. ISSN 1087-1357

Khan, A., Ceglarek, D. and Ni, J.. (1998) Sensor location optimization for fault diagnosis in multi-fixture assembly systems. Journal of Manufacturing Science and Engineering, Vol.120 (No.4). pp. 781-792. ISSN 1087-1357

Ceglarek, D. and Shi, J.. (1998) Design evaluation of sheet metal joints for dimensional integrity. Journal of Manufacturing Science and Engineering, Vol.120 (No.2). pp. 452-460. ISSN 1087-1357

Ceglarek, Dariusz and Szafarczyk, M.. (1998) Multivariate analysis and evaluation of adaptive sheet metal assembly systems. CIRP Annals - Manufacturing Technology, Vol.47 (No.1). pp. 17-22. ISSN 0007-8506

Shiu, B. W., Ceglarek, Dariusz and Shi, J.. (1997) Flexible beam-based modeling of sheet metal assembly for dimensional control. Transactions of the North American Manufacturing Research Conference, Vol.25 . pp. 49-54. ISSN 1047-3025

Ceglarek, D. and Shi, J.. (1996) Fixture failure diagnosis for autobody assembly using pattern recognition. Journal of Engineering for Industry, Vol.118 (No.1). pp. 55-66. ISSN 0022-0817

Shiu, B. W., Ceglarek, Dariusz and Shi, J.. (1996) Multi-stations sheet metal assembly modeling and diagnostics. Transactions of the North American Manufacturing Research Conference, Vol.24 . pp. 199-204. ISSN 1047-3025

Ceglarek, Dariusz and Shi, J.. (1995) Dimensional variation reduction for automotive body assembly. Manufacturing Review, Vol.8 (No.2). pp. 139-154. ISSN 0896-1611

Ceglarek, D., Shi, J. and Wu, S. M.. (1994) A knowledge-based diagnostic approach for the launch of the auto-body assembly process. Journal of Engineering for Industry, Vol.116 (No.4). pp. 491-499. ISSN 0022-0817

This list was generated on Sun May 19 00:53:48 2013 BST.
twitter

Email us: publications@warwick.ac.uk
Contact Details
About Us